Stage 1, the base
Stage 1 A recent concrete base for a 6man hot tube. 7inch thick concrete with reinforced steel mesh along with concrete fibres to improve structural integrity, reduce shrinkage, and minimize cracking. Stage 2 pending with a raised composite decking area along with composite cladding sides and steps.
Stage 2, the deck
Stage 2 of this project and very jealous of this set up. Here you see a raised 6x2 timber frame which was protected with waterproof paint then finished with cladcoprofiles bullnose outer boards in Coffee and the main decking area in wood grain effect Teak boards. We also added a raised walkway leading to the existing timber decking area. Thank you to Cornwall Pools for working around us with the hot tub lid brackets.